I have complained twice. First time the engineer came told to check the voltage of the house and left. When checked the voltage it was found to be proper so I took the pain of complaining again. Second time the engineer came and took ac after two days he called me there is a problem in PCB but when i called that engineer he is not giving proper answer to me its almost one month please solve my problem as soon as possible i am very disappointed.
I have complained twice. First time the engineer came told to check the voltage of the house and left. When checked the voltage it was found to be proper so I took the pain of complaining again. Second time the engineer came and took ac after two days he called me there is a problem in PCB but when i called that engineer he is not giving proper answer to me its almost one month please solve my problem as soon as possible i am very disappointed.